Iron Ore Mine Project

Case Study: Large-Scale Water Storage Solution for Iron Ore Mine in Pilbara – 2023 

Client: Pilbara Iron Ore Mine 

Year: 2023 

Solution Provided by: Get Wet Solutions 

Location: Pilbara, Western Australia 

1. The Challenge: Water Storage Solution for Dust Suppression 

The Pilbara iron ore mine faced a critical need for a high-volume water storage solution to support dust suppression activities for their fleet of water trucks. They required a system capable of delivering water at extremely high flow rates to ensure efficient dust control. Traditional methods, including hard-sided tanks and turkey-nest solutions, proved to be costly, time-consuming, and environmentally intrusive. 

2. Objectives: High-Flow Water Storage Tank with Minimal Environmental Impact 

The key objective of this project was to design and deliver a water storage solution with the capability to handle flow rates of 400–600 litres per second. The client needed a reliable and efficient system that could quickly fill water trucks and support dust suppression operations while being environmentally friendly and cost-effective. 

3. Solution Provided: Custom Water Bladder Tank System 

Get Wet Solutions delivered a 2-million-litre water bladder tank, designed to meet the specific needs of the Pilbara iron ore mine. The solution included the following features: 

High-Flow Water Storage System 

  • 2-million-litre bladder tank with 600mm valves and a manifold system capable of delivering over 400 litres per second to the truck fill standpipe. 
  • High-flow pump to ensure steady water delivery. 
  • Remotely operated level monitoring system for efficient management of water levels. 

Solar-Powered & Safe Overflow Features 

  • Solar-powered battery system with an auto shut-off feature to prevent overfilling, ensuring the bladder remains full without risk of spillage. 
  • Safe overflow loop to protect the system from potential failures. 

Integration with Existing Infrastructure 

  • The bladder tank was connected to the existing bore field, requiring the installation of several kilometers of HDPE pipe, which was welded onsite by Get Wet technicians. 

Why Choose a Bladder Tank Solution? 

The client chose Get Wet’s bladder system for several key reasons: 

  • No excavation was required, saving time and avoiding the need for permitting and approval processes. 
  • Rapid installation – the bladder tank was installed in less than a day, significantly reducing project timelines. 
  • Cost-effective and environmentally friendly solution with no need for construction work such as concrete pouring or digging. 
  • UV protection, wildlife-friendly, and fully recyclable, built to withstand harsh Australian conditions, with a 10-year warranty and a 20-year lifespan

4. Results and Benefits: Efficient, Scalable, and Sustainable Solution 

Key Outcomes 

The installation of the custom water bladder system led to significant improvements in the client’s operations: 

  • Decreased truck fill-up times from 42 minutes to under 3.5 minutes, streamlining operations and improving fleet efficiency. 
  • Increased water storage capacity from 500,000 litres to 2,000,000 litres, ensuring sufficient water for ongoing dust suppression. 
  • Rapid installation completed in under one day, reducing downtime and allowing for quicker project completion. 
  • Environmentally friendly solution with no excavation or construction work, reducing the project’s environmental impact. 

Measurable Results 

  • Reduced truck fill-up times from 42 minutes to 3.7 minutes. 
  • Increased storage capacity by 300%, from 500,000 litres to 2,000,000 litres. 
  • Decreased fuel burn for CAT-777 trucks by 4 hours per 12-hour shift, lowering operational costs. 
  • Increased dust suppression operational hours by improving water on roads (WOR) and extending operational time for water trucks. 
  • Installed and operational within a few short hours of arrival on site. 

5. Challenges and Solutions: Overcoming Tight Deadlines and Custom Requirements 

Despite tight deadlines and specific requirements, Get Wet Solutions delivered a fast, durable, and efficient water storage solution that met the client’s needs. The key challenges included the rapid installation timeline and the need for a system that could handle high water flow rates without disruption. 

Challenges Addressed 

  • Rapid installation: The bladder tank was up and running in a matter of hours, avoiding delays in the client’s ongoing operations. 
  • Custom design: The system was tailored to meet specific flow rate requirements, ensuring optimal performance for dust suppression needs. 

Conclusion: Efficient and Cost-Effective Water Storage Solution 

Get Wet Solutions successfully delivered an efficient, environmentally friendly, and cost-effective water storage solution that supported the Pilbara iron ore mine’s dust suppression activities. The custom bladder tank system exceeded expectations by reducing fill-up times, increasing storage capacity, and providing a quick and sustainable solution for the mine.